DANDENONG STAR JOURNAL
Home » Dandenong underpass two years ahead of schedule

Dandenong underpass two years ahead of schedule

A Dandenong level crossing removal project will be brought forward two years ahead of schedule, with final designs revealed.

The Webster Street boom gates will be removed in late 2025, replaced with a new rail bridge and a nearby road underpass connecting Princes Highway-Lonsdale Street to Cheltenham and Hammond roads.

As part of the design, traffic will be diverted from the Dandenong CBD and heavy vehicles off Webster Street.

Works will soon start on the underpass, which will tunnel through the Mamara supermarket site on the corner of Thomas and Lonsdale streets.

After engineering assessments, the new rail bridge structure will be built before excavating the underpass, the State Government announced.

This means the road was now slated to open in 2026 – two years ahead of schedule.

An alliance of John Holland Group, Kellogg Brown and Root, Metro Trains Melbourne and the Level Crossing Removal Project will build the new underpass and remove the level crossing.

The project also includes a new pedestrian and cycling underpass beneath the existing Dandenong Creek rail bridge connecting to the Dandenong Creek Trail.

A signalised intersection will be built at Princes Highway-Lonsdale Street.

According to the Government, the Webster Street level crossing is one of the most dangerous in Melbourne, with 22 near misses recorded since 2012.

Boom gates are down for 62 minutes during the morning peak, causing traffic congestion in central Dandenong.

Removing eight level crossings in the Greater Dandenong area will save around six hours of boom gate down time each morning, the Government states.

It will also coincide with the opening of the Metro Tunnel project, allowing more services to run on the Cranbourne and Pakenham lines.

Transport Infrastructure Minister Danny Pearson said the Government was removing every level crossing on the Cranbourne and Pakenham lines, improving traffic flows and safety on South East roads.

“The Webster Street level crossings will be the last to go on the Pakenham Line, and this project, together with the Metro Tunnel, will change the way people live, work and travel,”

Dandenong MP Gabrielle Williams said the new east-west road connection would help to take trucks out of the Dandenong CBD.

Digital Editions


More News

  • Letter-to-the-editor: Who will grow the trees?

    Letter-to-the-editor: Who will grow the trees?

    Purchase this photo from Pic Store: 492338 This summer’s repeated 40-degree days have made one thing unavoidable: Melbourne’s suburbs are heating up, and trees are no longer decorative extras. Councils…

  • Bail plan flagged for accused teacher

    Bail plan flagged for accused teacher

    A former teacher accused of stabbing a principal at Keysborough Secondary College may require involuntary mental health treatment, a defence lawyer has told court. Kim Ramchen, 37, of Mulgrave, appeared…

  • ‘I love what I’m doing’: Meals on Wheels volunteer awarded

    ‘I love what I’m doing’: Meals on Wheels volunteer awarded

    The City of Greater Dandenong Australia Day Volunteer of the Year is awarded to an individual who has dedicated more than 30 years in giving back to the community. Heather…

  • Cracking start to the year

    Cracking start to the year

    **There are different ways of breaking a cricket bat. TOORADIN star Cal O’Hare has done it twice the conventional way; basically being too good for his own good; breaking two…

  • Cricket, Cranny and Carlos

    Cricket, Cranny and Carlos

    BLAIR: Well fellas, we’re back for Let’s Talk Sport and there’s no shortage of things to chat about. Cricket season is getting to the pointy end and we’ve had plenty…

  • Casey residents surveyed to guide community wellness

    Casey residents surveyed to guide community wellness

    Some Casey locals might get their chance at providing critical feedback and insights and in turn, help the council shape the future of health and wellbeing in their area. Over…

  • Commuters say Metro Tunnel trips now harder

    Commuters say Metro Tunnel trips now harder

    South East commuters say the new Metro Tunnel service on the Cranbourne and East Pakenham lines has made travelling to the city more time-consuming, less convenient, and stressful. The changes…

  • Two-hour police pursuit ends in jail

    Two-hour police pursuit ends in jail

    Purchase this photo from Pic Store: 481350 A Frankston serial car thief has been jailed for up to 26 months after a perilous, two-hour police pursuit across the South East.…

  • Two charged after alleged armed home invasion in Narre Warren South

    Two charged after alleged armed home invasion in Narre Warren South

    A Doveton man and a Berwick man have been charged following an alleged armed home invasion in Narre Warren South during the early morning of Wednesday 4 February. South Metro…

  • Empowering migrant water safety

    Empowering migrant water safety

    Dr Harpreet Singh Kandra often recalls the story of his nearly fatal drowning when he was a boy. The community volunteer and professor at Federation University, remembers the moment he…